20-1018 Hansen HLLSW Long Leads for Purger Switch Kit
These Hansen refrigerant liquid level float switches (HLL Series) are used to electrically indicate or control a liquid level by opening or closing a SPDT switch.
These Hansen refrigerant liquid level float switches (HLL Series) are used to electrically indicate or control a liquid level by opening or closing a SPDT switch. Their simple, reliable design provides long life performance for almost any application
Applications
These refrigerant liquid level float switches are typically installed on a vessel's liquid level column. They can control liquid level by controlling a liquid fill solenoid valve. Often, they are used to provide high level cutout or alarm. In addition, they can be used to turn off a recirculating liquid pump if a low level occurs. Other applications include control of liquid level via a liquid exit solenoid valve, level indication via a pilot light, and transfer drum operation.
Features:
Magnet
Lever Arm
Clear Housing Hermetically Sealed
Option Heater
1/2" NPSM Conduit Connection (Option DIN Plug)
Side View
Retaining Screw
Upper Spring
3/4" FPT/1" Buttweld Connection HLLS, HLLSC Only
Lower Spring
High Pressure Tested Float Ball
Welded Tank and Neck Assembly Eliminates Gasket Leak Potential
Attractor
Groove
Switch Assembly Position Rotates 360°
Option Metal Cover
Heavy Duty 10 Amp SPDT Switch
More Information
More Information
Weight
2.000000
Condition
New
Manufacturer
Hansen
Reviews
Product Questions
Industrial Refrigeration Parts is now part of Keep Supply, our new brand.
Beyond parts — a shorter name, bigger commitment to you.